Florida tester routes

Florida approved backflow tester lists by utility.

Use this page to find Florida utility routes where BackflowPath has a published official tester-list path. The governing utility page remains the route that decides the list and reporting workflow.

8 official tester routes State guide: Florida backflow testing requirements Local utility rules stay canonical
Official routes

Open the utility list before choosing a tester

Each route below points to a utility page that separates the official authority list from non-official provider discovery.

florida

City of Tallahassee Utilities Cross-Connection Control

Open the Tallahassee utility documents page for the tester list

  • Last verified 2026-06-29
  • Annual by default, biennial for qualifying residential assemblies
florida

City of West Palm Beach Cross-Connection Control and Backflow Program

Open the West Palm Beach approved plumbing contractors list

  • Last verified 2026-06-29
  • Upon installation and on the city's recurring certification cycle
florida

Hillsborough County Water Resources Backflow and Cross Connection Service Testing

Open Hillsborough County's certified tester page

  • Last verified 2026-06-29
  • Annual
florida

JEA Backflow Program

Open JEA's qualified backflow tester list

  • Last verified 2026-06-29
  • Commercial annually; residential irrigation on the JEA residential checkup cycle, generally every two years
florida

Manatee County Utilities Cross Connection Control Program

Open the Manatee County program page for the county potable testers list

  • Last verified 2026-06-29
  • Annual testing and county-directed retest timelines
florida

Orange County Utilities Cross Connection Control

Open the Orange County Utilities cross-connection page for tester search instructions

  • Last verified 2026-06-29
  • On the county program cycle for protected assemblies
florida

Sarasota County Public Utilities Cross-Connection Control Program

Open the Sarasota County approved contractor list

  • Last verified 2026-06-29
  • On the county notification cycle, with annual operational testing where required