Portal city route

Irving backflow reporting portal

Use this page when a notice for Irving mentions BSI, SwiftComply, WEIRS, VEPO, a customer portal, or online backflow test report submission.

City: Irving Utility: City of Irving Cross Connections and Backflow Cadence: Periodic and event-driven testing with online report submission Last verified: 2026-07-06
Local answer

What to check for Irving

Use this page when a notice for Irving mentions BSI, SwiftComply, WEIRS, VEPO, a customer portal, or online backflow test report submission.

  • Due basis: Irving requires backflow test reports to be submitted online through Envirotrax within 10 days of the test date, with permit verification needed for newly replaced or installed assemblies before testing.
  • Notice or device clue: Look for the BPAT/tester registration context, Envirotrax record, service address, or assembly identifier.
  • Who is affected: Irving customers with reportable backflow assemblies, newly installed or replaced assemblies, failed tests, and testers submitting through Envirotrax.
  • Acceptance rule: Report acceptance depends on the named portal and the utility-approved tester route; keep proof that the report was submitted.
  • Program phone: 972-721-2104
Local signals

Signals that matter before you act

  • Irving cross connections and backflow page - official program page
  • Envirotrax online backflow report submission - submission portal
  • Due basis: Irving requires backflow test reports to be submitted online through Envirotrax within 10 days of the test date, with permit verification needed for newly replaced or installed assemblies before testing.
  • Program phone: 972-721-2104
Workflow

Irving workflow order

  1. Confirm whether the assembly is new, replaced, failed, or otherwise due for reporting.
  2. Use a tester with current license, test kit calibration, and Envirotrax registration.
  3. Have the tester submit online through Envirotrax within 10 days.
  4. If the test failed, make sure the customer is notified that repair or replacement and retesting are required.